01 NCAC 30E .0304          INTERIM DESIGNER OR CONSULTANT EVALUATION

The designer or consultant may request preparation of an interim evaluation form by the Capital Projects Coordinator or the Coordinator may elect to prepare an interim evaluation if so desired. This interim evaluation is intended to reflect performance to date and should be used as a guidance device for correction of performance prior to the final evaluation.

 

History Note:        Authority G.S. 143‑135.25; 143‑135.26;

Eff. October 1, 1988;

Amended Eff. May 1, 1990;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. July 22, 2018.